Compact grout plant was send to Bangkok by air for tunnel grouting work
Gaodetec compact grout plant was used for tunnel grouting work in Bangkok. For the GGP250/700/75PI-E grouting plant , It with 250L high shear high speed grout mixer volume, agitator volume is 700L, max. grout pressure is 75Bar, grout flow is 100L/min, the mixer is one vortex mixer could make sure mix cement slurry evenly and more quickly. The compact grout plant was widely used for following grouting work: Civil engineering - dam, tunnel, subway, mine, soil nailing wall, curtain, anchor, cable trench and anchor grouting; Building structure - building and bridge repair, foundation reinforcement, slope support, soil compaction, rock grouting; Engineering - underwater foundation, offshore platform, coast foundation grouting reinforcement Mine application - roadway reinforcement, backfill, waterproof grouting. The grout plant size is 2710x1100x1820mm, very small, if need it urgently, could transport it by air. In this way, could save tra