Compact grout station for civil engineering construction

The compact grout station for civil engineering construction is primarily to resolve the inherent flaws in pile sediment and pileside mud skin in the protection of boring piles in mud walls. After a certain period of time after the boring pile is formed, cement slurry is injected into the pile side grout valve connected to the pile end and the pile end from the grout pipe installed in the pile body in advance, and the pile end and the pile are used. Side soil (including deposits and mud) is poured into the cement slurry. The mud skin is reinforced to increase the bearing capacity of the single pile and reduce subsidence.

Compact grout station for civil engineering construction is a complete device for mixing, mixing, and grout injection. It consists of a pulp making machine, a mixing tank and a low pressure grout pump. The advantages of the injection system for self-drill anchors are simple structure, reliable work performance, high pulping efficiency and low component wear.
                            
Compact grout station for civil engineering construction can effectively mix cement (or similar material) with water and inject grout into cement slurries or similar slurries. The complete injection system can be used for tunnels, mining, irrigation projects, slope stabilization and underground, cement project reinforcement and stabilization, etc.
                           
Compact grout station for civil engineering construction has the following features:

1. Suitable for all grout injection applications of cement and ultrafine cement.

2. Bentonite suspension for microtunnels, pipe jacks and directional drilling.

3. Ergonomic and saves space.

4. The grout pump hydraulic system consists of Yuken hydraulic parts and so on.

5. Use of extrusion valves to implement a functional switch between the mixer and the pulp maker.

6. Fully electric motor or diesel engine as power source.

When using the compact grout station for civil engineering construction, you need to be aware of the following:

1. Make sure the pipeline connection is reliable and the power connection is correct.

2. Run the self-drill anchor cycle test injection system to ensure everything is normal before placing the suction tube in the grout injection tank (the grout injection tank must be grounded).

3. After injecting grout, it is necessary to clean the inside of the grout injection machine so that the grout does not solidify in the machine.

4. Clean the outside of the self-drill anchor injection system and turn off the power after confirmation.

If you are interested in the grout station for civil engineering construction , please contact us. Email: info@gaodetec.com