New style colloidal cement slurry grout mixer pump
How to install and debug new style colloidal cement slurry grout mixer pump? What are the precautions for cement grout and bentonite grout equipment? We believe that many customers will face such issues. Gaodetec Equipment Co., Ltd. provides detailed introduction of cement grout equipment installation and testing machine process and operational precautions to help customers operate cement grout pumps more safely and efficiently. If you have any questions during use, please feel free to contact us. We provide comprehensive technical support for free.
Installation of new style colloidal cement slurry grout mixer pump process:
1. When the colloidal cement slurry grout mixer pump arrives at the construction site, first remove the protective film, add the specified hydraulic oil and add it to the display position of the oil window.
2. Connect the suction pipe and grout pipe. The connection between the grout injector's suction pipe and suction port must be tightly tied to prevent leakage.
3. Put the slurry pipe in clean water to test the machine and click the motor switch to make sure the direction of rotation is correct before using.
4. Check if the pressure gauge switch on the bentonite grout device and the pressure adjustment handle on the overflow valve are open.
5. Start the bentonite grout device, adjust the oil pressure to 1-2Mpa for 3 minutes after the test run, open the mixer valve to a certain level, adjust the oil pressure to the set pressure, then stop and prepare the machine. .. Formal grout injection operation.
Precautions for colloidal cement slurry grout mixer pump operation:
1. New style colloidal cement slurry grout mixer pump should be placed as horizontally as possible to avoid twisting and discounting of oil pipes and slurry suction pipes. The distance between the slurry suction pipes should be as short as possible and the vertical distance should not exceed 1 meter.
2. Regularly inspect and clean the oil tank net and oil filter screen, and change the hydraulic fluid regularly. It is recommended to change the hydraulic oil about once a month. When changing the hydraulic oil, pay attention to the specified hydraulic oil change. The amount of oil is about 45 kg.
3. The work site of cement grout equipment needs a sufficient water source to facilitate the work.
4. All hydraulic joints should be checked regularly and should not be loosened.
5. New style colloidal cement slurry grout mixer pump must have some grout experience to ensure smooth construction work.
6. Electrical control boxes, motors and appliances should be kept clean and dry, and the wires of the above components should be checked frequently to prevent damage to prevent leaks.
7. When transporting the grout pump, do not have a large hump and do not hit all parts freely.
If you would like to know more about the facilities and prices of New style colloidal cement slurry grout mixer pump, please feel free to contact
Installation of new style colloidal cement slurry grout mixer pump process:
1. When the colloidal cement slurry grout mixer pump arrives at the construction site, first remove the protective film, add the specified hydraulic oil and add it to the display position of the oil window.
2. Connect the suction pipe and grout pipe. The connection between the grout injector's suction pipe and suction port must be tightly tied to prevent leakage.
3. Put the slurry pipe in clean water to test the machine and click the motor switch to make sure the direction of rotation is correct before using.
4. Check if the pressure gauge switch on the bentonite grout device and the pressure adjustment handle on the overflow valve are open.
5. Start the bentonite grout device, adjust the oil pressure to 1-2Mpa for 3 minutes after the test run, open the mixer valve to a certain level, adjust the oil pressure to the set pressure, then stop and prepare the machine. .. Formal grout injection operation.
Precautions for colloidal cement slurry grout mixer pump operation:
1. New style colloidal cement slurry grout mixer pump should be placed as horizontally as possible to avoid twisting and discounting of oil pipes and slurry suction pipes. The distance between the slurry suction pipes should be as short as possible and the vertical distance should not exceed 1 meter.
2. Regularly inspect and clean the oil tank net and oil filter screen, and change the hydraulic fluid regularly. It is recommended to change the hydraulic oil about once a month. When changing the hydraulic oil, pay attention to the specified hydraulic oil change. The amount of oil is about 45 kg.
3. The work site of cement grout equipment needs a sufficient water source to facilitate the work.
4. All hydraulic joints should be checked regularly and should not be loosened.
5. New style colloidal cement slurry grout mixer pump must have some grout experience to ensure smooth construction work.
6. Electrical control boxes, motors and appliances should be kept clean and dry, and the wires of the above components should be checked frequently to prevent damage to prevent leaks.
7. When transporting the grout pump, do not have a large hump and do not hit all parts freely.