Excellent working results grouting units Austria

The application of the excellent working results grouting units is primarily to resolve the inherent imperfections of pile sediment and pile side mud skin in the protection of boring piles on mud walls. After a certain period of time after the boring pile is formed, cement slurry is injected into the pile end and the pile side grout valve connected to the pile end from the grout pipe installed in the pile body in advance, and the pile end and pile side soil ( (Contains deposits and mud) is injected into the cement slurry.
                          
Excellent working results grouting units Austria is a complete device for mixing, mixing, and grout injection. The grouting units consists of a pulp making machine, a mixing tank and a low pressure grout pump. The advantages of the grouting units are simple structure, reliable work performance, high pulping efficiency and less wear on parts.

                             
Excellent working results grouting units Austria can effectively mix cement (or similar material) with water and inject grout into cement slurries or similar slurries. The complete injection system can be used for tunnels, mining, irrigation projects, slope stabilization and underground, cement project reinforcement and stabilization, etc.
                          
The excellent working results grouting units has the following features:

1. Suitable for all grout injection applications of cement and ultrafine cement.

2. Micro tunnels, pipe jacks, bentonite suspensions for directional drilling.

3. Ergonomic and saves space.

4. The grout pump flood system consists of Yuken hydraulic parts and other parts.

5. Use of extrusion valves to achieve functional switching between mixers and pulp maker.

6. Fully electric motor or diesel engine as power supply.
                         

When using the excellent working results grouting units, you need to be aware of the following:

1. Make sure the pipeline connection is reliable and the power connection is correct.

2. Run the self-drill anchor cycle test injection system to ensure everything is normal before placing the suction tube into the grout injection tank (the grout injection tank must be grounded).

3. After grout injection, it is necessary to clean the inside of the grout injection machine so that the grout does not solidify in the machine.

4. Clean the outside of the self-drill anchor injection system and turn off the power after confirmation.

If you are interested in the excellent working results grouting units, please contact us. Email: info@gaodetec.com.












评论

此博客中的热门博文

LGP500/700/100PI-E grout station

Gaodetec grout mixer making cement for foundation grouting in Vietnam

Manual cement grouting pump supplier