China supply bentonite grout mixer and agitator sales
Gaodetec Eupiment has grout cement mixers for sale, grout cement mixers make mixing efficient and beneficial to the owner. Materials such as cement, water, bentonite and additives are pumped through the high speed impeller pump and the pump rotation speed is 1500 rpm to prevent agglutination and achieve complete wetting. Mixing time is only 2-3 minutes, saving time cost. China supply bentonite grout mixer and agitator sales increase the apparent fluidity of slurry mixtures by 20% over paddle mixers, providing significant benefits for dams, rocks, soil grouts and more.
Instruction Manual for using bentonite grout mixer and agitator sales:
1. Check and fix the mixing impeller and make sure that the slurry pipe does not leak.
2. Add an appropriate amount of water, start the equipment to clean and moisten the pulping barrel and pipeline, and drain the water to the pulping machine after cleaning.
Add 3, 80 kg or more of water, start the pulp making machine, add the powder evenly in the specified order, control the supply time within 5-6 minutes, after all the powder has been added 3 ~ Continue stirring for 5 minutes.
4. Carry the prepared slurry to the slurry storage barrel to maintain dynamic slurry storage.
5. Connect the grout injection machine pipe to the slurry storage barrel or carry it directly to the injection machine hopper before starting the injection.
6. Immediately after injecting grout, clean the equipment and pipeline and start the pulper so that the cement slurry remaining in the pulper and pipeline can be recycled.
Maintenance of bentonite grout mixer and agitator sales:
1. Before starting the machine, make sure that the moving parts are not clogged by hand and that the connections are fixed everywhere. Then you can turn on the machine and idle. Watch for other abnormalities in the equipment during operation (continue to add water to the transmission assembly for cooling during operation) so that the motor rotates clockwise when viewed from the transmission assembly connection shaft. Pay particular attention.
2. Periodically check that 3 # base grease has been added to the transmission assembly.
3. Avoid prolonged idle operation of the circulation pump and keep large hard particles and easy-to-roll ribbons out of the circulation pump.
4. When cleaning the grout cement mixer, the valves at the bottom of the pulp barrel and the bottom of the circulation pump should be opened to completely drain the residual cement slurry so that hardening does not affect the efficiency of the appliance.
5. Periodically adjust the tightness of the packing seal of the pump unit. It is advisable to drip a small amount of water from the packing box. Excessive compression affects the service life of the packing and the efficiency of the equipment.
More details about the bentonite grout mixer and agitator sales, please contact us by email:info@gaodetec.com
Instruction Manual for using bentonite grout mixer and agitator sales:
1. Check and fix the mixing impeller and make sure that the slurry pipe does not leak.
2. Add an appropriate amount of water, start the equipment to clean and moisten the pulping barrel and pipeline, and drain the water to the pulping machine after cleaning.
Add 3, 80 kg or more of water, start the pulp making machine, add the powder evenly in the specified order, control the supply time within 5-6 minutes, after all the powder has been added 3 ~ Continue stirring for 5 minutes.
4. Carry the prepared slurry to the slurry storage barrel to maintain dynamic slurry storage.
5. Connect the grout injection machine pipe to the slurry storage barrel or carry it directly to the injection machine hopper before starting the injection.
6. Immediately after injecting grout, clean the equipment and pipeline and start the pulper so that the cement slurry remaining in the pulper and pipeline can be recycled.
Maintenance of bentonite grout mixer and agitator sales:
1. Before starting the machine, make sure that the moving parts are not clogged by hand and that the connections are fixed everywhere. Then you can turn on the machine and idle. Watch for other abnormalities in the equipment during operation (continue to add water to the transmission assembly for cooling during operation) so that the motor rotates clockwise when viewed from the transmission assembly connection shaft. Pay particular attention.
2. Periodically check that 3 # base grease has been added to the transmission assembly.
3. Avoid prolonged idle operation of the circulation pump and keep large hard particles and easy-to-roll ribbons out of the circulation pump.
4. When cleaning the grout cement mixer, the valves at the bottom of the pulp barrel and the bottom of the circulation pump should be opened to completely drain the residual cement slurry so that hardening does not affect the efficiency of the appliance.
5. Periodically adjust the tightness of the packing seal of the pump unit. It is advisable to drip a small amount of water from the packing box. Excessive compression affects the service life of the packing and the efficiency of the equipment.
More details about the bentonite grout mixer and agitator sales, please contact us by email:info@gaodetec.com
评论
发表评论