High working efficiency underground mining grout plant

High working efficiency underground mining grout plant is a complete set of equipment that combines a mud machine and a grout pump to perform efficient, low-consumption tasks and effectively reduce complex procedures and long-distance operations. The grout mixer performs high-speed pulping production and storage of cement slurries and other similar materials, then pumps the slurries directly to construction connection points using pumps directly for uninterrupted grout and grout injections. 

                     

High working efficiency underground mining grout plant are primarily used in the construction of roads, railroads, hydropower, construction, mines and other ground and underground projects. Quickly mix water, cement, sand, bentonite, fillers, clay, silicates and other media. The grout pump is then used for grout / grout to provide waterproof plugging, tunnel lining, foundation and bedrock reinforcement, and gap filling functions. This series of grout pumps has the advantages of compact construction, high grout pressure, and wide range of applications.

                            

High working efficiency underground mining grout plant can be used in the following applications:

Civil Engineering-Soil Nail, Kickback, Ground Anchor, High Pressure Magma

Structures-building repairs, foundation reinforcements, foundation reinforcements, soil compactions and grouts

Construction-Post tension, sealing under the board, top and board height

Ocean-Underwater Foundations, Dock, Crusher, Coastline Foundations

Mining-High Pressure Rock Grout, Tunnel Lining, Contact Grout, Waterproof, Cables and Lock Bolts

Utilities-Environmental protection structure, waterproof, dam foundation

Geoengineering-deep well casings, surveillance wells, closures and abandonments
                       

Precautions when using the underground mining grout plant:

1. When the underground mining grout plant in operation, grout workers must not leave the post without permission.

2. While operating the device, the operator must not put his or her hands or other objects in the running or protective areas.

3. The operator should check the equipment daily and change the grease on the equipment on a regular basis. After each shift, make sure the equipment is working properly and the pipeline is unobstructed.

4. Closing the water valve during the grout injection process is strictly prohibited to prevent blockage of equipment and pipelines.

5. Grout plant pumps with mixers need to be overhauled and maintained to ensure proper operation of electromechanical equipment. After each grout is complete, all equipment should be overhauled.


                         

6. If pulping workers are not allowed to enter the material processing storage tank, they will supervise the transportation equipment in time, load the material to ensure that the slurry concentration is normal, and of the filter. You need to make sure that the exit is normal.

7. You will need to contact the relevant department in time after a sudden power outage or water outage. After power is restored, the water purification pump flushes the pipeline so that it is not blocked before starting grout injection.

If you are interested in the underground mining grout plant, please contact us! Email:info@gaodetec.com









评论

此博客中的热门博文

LGP500/700/100PI-E grout station

Gaodetec grout mixer making cement for foundation grouting in Vietnam

Manual cement grouting pump supplier